• St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
  • St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
  • St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
  • St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
  • St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
  • St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391

St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391

Type: Seamless
Technique: Cold Drawn
Material: Carbon Steel
Surface Treatment: Black, Hot Rolled + Cold Drawn
Usage: Hydraulic/Automobile Pipe, Machinery Industry, Chemical Industry, Mining
Section Shape: Round
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2021

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 9 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (15)

Basic Info.

Model NO.
CDS Tube
Od Range
21.3 - 273 mm
Special Pipe
API Pipe, Thick Wall Pipe
Standard
ASTM, DIN2391
Length
6m, 6.4m, 5.8m, as Required
Material Grade
St52, E355, Stkm13c, Ck45, 25mn, 42CrMo4, etc.
Oiled or Non-Oiled
Oiled
Delivery Time
7-20days
Key Words
St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppl
Nature
Manufacturer
Mill Location
Shandong, Jiangsu
Application
Cylinder Pipe, Fluid Pipe, Gas Pipe, Oil Pipe, etc
Transport Package
Wooden Case, Container
Specification
20GP, 40HQ
Trademark
HYDSTEELS
Origin
Wuxi, China
HS Code
73043120
Production Capacity
20000tons/Year

Product Description

ST52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391

Professional manufacturer of Cold drawn seamless steel tube & Honed tube, founded in 2004, one of biggest manufacturer in China. Rich experience in production and export, prefect products & services gained recognition of clients from 40 countries.

>Equipment cover all production processing with stick QC system make better quality and keep improve. 
>Huge material purchasing reduce production cost and final rate. 
>Rich stock for normal size, order could be fast delivery in 7days.
>100% inspection and one-year quality guarantee to avoid any risk choice us.  
St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391

Product Processing
St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
SIZE RANGE DIAMETER: 21.3MM-610MM; THICKNESS: 2.0MM-15.0MM
MATERIAL GRADE Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2
Q355 = S355JR / A500 Grade B Grade C
STANDARD API 5L ASTM A53 (SCH10; SCH40), ASTM A500
PIPE SURFACE Black, Oiled or Galvanized
PIPE ENDS PLAIN ENDS / BEVEL ENDS WITH PLASTIC CAPS
TRADE TERMS FOB/ CFR/ CIF/ EXW/ FCA
PAYMENT TERMS 30%&70% T/T; 100% LC AT SIGHT (others can be negotiated)
DELIVERY TIME 7-20 DAYS AFTER RECEIVE DEPOSIT OR LC
HOT SALES MARKET Southeast Asia, South Asia, Middle East, Europe, Middle& South America, Africa and Oceania

Quality Standards
DIN 2391 Seamless Precison Steel Tubes
EN10305 Steel Tubes for Precision Applications Seamless Cold Drawn Tubes
ASTM A519 Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing
JIS G3445 Carbon Steel Tubes for Machine Structural Purposes


Chemical Composition(%)
Grade C Si Mn P S Cr Mo
ST45 (DIN1.0408) 0.21 max 0.35 max 0.40 min 0.025 max 0.025 max / /
ST52 (DIN1.0580) 0.22 max 0.55 max 1.60 max 0.025 max 0.025 max / /
E355 0.22 max 0.55 max 1.60 max 0.025 max 0.025 max / /
1020 0.18-0.25 / 0.30-0.60 0.040 max 0.050 max / /
1026 0.22-0.28 / 0.60-0.90 0.040 max 0.050 max / /

Mechanical Properties( T=20°C if not differently stated ):
Grades Delivery Conditions Tensile Strength Rm (Mpa) Elongation in the longitudinal direction Al (%)
ST45 +A (GBK) 390 min 21 min
ST52 +A (GBK) 490 min 22 min
E355 +A (GBK) 450 min 22 min
1020 +A (GBK) 390 min 21 min


Equipment Show Honed Tube China
As one of the biggest honed tube piston rod manufacturers in China, we equipped with advanced production facilities and inspection facilities for honed pipe manufacturing and inspection. 
St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391
Why Choice Us
1.Professional, rich experience, reliable.

2.One-stop collection for honed tube, chrome rod, casting cylinder components.
3.Full range of size and material, ready stock goods with fast delivery
4.Customizable, non-standard sizes available
5.Small quantity acceptable
6.Refund or replace if any quality issue.


 
DN OD ASTM A53 / API 5L / ASTM A106
SCH10S SCH20 STD SCH40 SCH60 SCH80 SCH100 SCH160
MM INCH MM MM MM MM MM MM MM
15 21.3 1/2" 2.11   2.77   3.73   4.78
20 26.7 3/4" 2.11   2.87   3.91   5.56
25 33.4 1" 2.77   3.38   4.55   6.35
32 42.2 1-1/4" 2.77   3.56   4.85   6.35
40 48.3 1-1/2" 2.77   3.68   5.08   7.14
50 60.3 2" 2.77   3.91   5.54   8.74
65 73 2-1/2" 3.05   5.16   7.01   9.53
80 88.9 3" 3.05   5.49   7.62   11.13
90 101.6 3-1/2" 3.05   5.74   8.08    
100 114.3 4" 3.05 4.5 6.02   8.56   13.49
125 141.3 5" 3.4   6.55   9.53   15.88
150 168.3 6" 3.4   7.11   10.97   18.26
200 219.1 8" 3.76 6.35 8.18 10.31 12.7 15.09 23.01
250 273.1 10" 4.19 6.35 9.27 12.7 15.09 18.26 28.58
  323.8 12" 4.57 6.35 10.31 14.27 17.48 21.44 33.32
  355 14" 6.35 7.92 11.13 15.09 19.05 23.83 36.71
  406 16" 6.35 7.92 12.7 16.66 21.44 26.19 40.49
  457 18" 6.35 7.92 14.27 19.05 23.83 29.36 46.24
  508 20" 6.35 9.53 15.09 20.62 26.19 32.54 50.01
  559 22" 6.35 9.53   22.23 28.58 34.93 54.98
  610 24" 6.35 9.53 17.48 24.61 30.96 38.89 59.54
St52 Cold Drawn Seamless Steel Pipe CDS Tube Suppliers DIN2391

FAQ
Q: Material sourcing
A: Valin, Resources Steelmaking, Jingjiang Special Steel, TPCO, 

Q: Delivery time?
A: Usually could be delivery in 30 days, urgent order could be delivery in 15days.

Q: Make to drawing?
A: Available

Q: MOQ request?
A: Min. 500kg

Q: What's your main market?
A: We mainly export to Middle East, South Africa and South Eastern Asia. And these two years our products enter to South America too.

Q: Are you factory?
A: Yes, we are.

Q: Payment item option?
A: T/T, L/C, D/P, O/A accept.

Q: Guarantee period?
A: One-year after manufactured, reject items will be resupply or refund.

Q: How to deal with defective products after delivery. 
A: Resupply or Refund available.


We sincerely hope there would be a chance for us to start business and build long term relationships may from an inquiry.
Honed Tube China

Patrick
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2021

Suppliers with verified business licenses

Import & Export Mode
Have Own Export License
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DDP, DAP, FCA, EXW